IES & RINA Joint lecture - Design and Build of Methanol Ready and All-Electric/ Hybrid Vessels

14th December 2026 6:30 pm

CMAL (Caledonian Maritime Assets Ltd.) are undergoing a significant fleet replacement programme, which will see CMAL take delivery of up to 20 RoPax vessels between now and 2030. CMAL will provide an overview of the strides they are taking in their new vessel designs to achieve low/ zero emission ferries for the Scottish Clyde, Hebrides and Northern Isles ferry services. This includes diesel electric Hybrid vessels, methanol ready vessels, and the flag ship all electric vessels as part of the Small Vessel Replacement Programme (SVRP). CMAL’s presentation will focus on two exciting projects: The ‘Methanol-Ready’ Northlink Freight Flex currently in basic/ detailed design phase with Guangzhou Shipbuilding International (GSI), China, and the SVRP Phase 2 which is currently in the concept design phase.

Lewis Bio

Lewis Hammell is a chartered engineer with RINA working as a Technical Manager with CMAL. Lewis has worked for CMAL for 10 years with a primary focus on newbuild projects taking vessels from concept design through to basic/ detailed design, construction, and eventually delivery of the vessels. This includes LNG Dual-Fuel vessels, diesel electric battery hybrid vessels, all electric vessels, and dual fuel methanol ready vessels. Most recently Lewis is the programme manager for the industry leading Small Vessel Replacement Programme, of which 7 vessels are under construction with a further 3 vessels in development, as well as the two new Northlink Freight Flex vessels which are in the basic/ detailed design phase.

Andrew’s Bio

Andrew Hannigan is an associate member of IMechE and has been with CMAL for 5 years, currently as Technical Superintendent. He works under the Technical Managers throughout the entirety of multiple projects, from concept design through to vessel delivery, and covering a mechanical site-supervision role within the shipyard. Andrew is the Project Manager for the SVRP Phase 2 project.

more details soon!

Listed in IES Events, Featured

Cite Top